Geomembrane for landfill sealing in Romania
Project name: Landfill sealing Satu Mare
Project date: 2010
Products: 10,000 m² smooth HDPE liner 2.0 mm, 42,000 m² structured HDPE liner 2.0 mm
Project name: Landfill sealing Satu Mare
Project date: 2010
Products: 10,000 m² smooth HDPE liner 2.0 mm, 42,000 m² structured HDPE liner 2.0 mm
Due to Romania‘s accession negotiations with the European Union, some conditions like the protection of the environment or the improvement of the infrastructure had to be fulfilled.
One point was proper waste treatment and the waste storage. A consortium consisting of German and Romanian companies was entrusted with the closure of the existing landfills, and the creation of a landfill in accordance with the latest EU standards in the area of Satu Mare.
The basic sealing of the landfill was completed within three weeks.
The new landfill is located about 4km way from Satu Mare. Besides ancillary facilities for waste separation and waste treatment, the creation of 5 cells for waste storage was planned.